<< Previous Topic | Next Topic >>Return to Index  

12th Lewis and Clark Fleet Replenishment Ship, USNS William McLean, Begins Construction

September 23 2009 at 12:51 PM
No score for this post

  (Login Brokenhalo12)

08:16 GMT, September 23, 2009 SAN DIEGO |
[linked image]
General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics (NYSE: GD), today began construction of the future USNS William McLean, the twelfth ship of the U.S. Navy's T-AKE program. The William McLean is named in honor of the Navy physicist who conceived and developed the heat-seeking Sidewinder missile. The ship is scheduled to be delivered to the Navy in the third quarter of 2011.

The T-AKE ship incorporates international marine technologies and commercial ship-design features, including an integrated electric-drive propulsion system to minimize operating costs over its projected 40-year service life. The primary mission of T-AKE ships is to deliver as much as 10,000 tons of food, ammunition, fuel and other provisions to combat ships at sea. NASSCO has delivered the first eight T-AKEs, which are also known as Lewis and Clark-class ships. The shipyard also has construction contracts for four additional T-AKEs and long-lead material contracts for two more ships for a total class of 14 ships.

http://www.defpro.com/news/details/9981/


    
This message has been edited by Brokenhalo12 on Sep 23, 2009 12:53 PM


 
Scoring disabled. You must be logged in to score posts.Respond to this message   
Current Topic - 12th Lewis and Clark Fleet Replenishment Ship, USNS William McLean, Begins Construction  Respond to this message   
  << Previous Topic | Next Topic >>Return to Index