Return to Index  

Yodelin Lifts

December 2 2007 at 2:39 PM
  (no login)


Response to Yodelin

The lower Riblet Chair was re-installed at Stevens in 1976 as Tye Mill. New tower bases were installed then the towers were flown directly off their foundations at Yodelin onto to the new bases at Tye Mill except for a couple exceptions. It has since been updated to a triple with a new drive. The upper Yodelin lift was sold to Crystal Mt and installed at High Campbell Basin. A new Riblet drive and was part of that install. The Day Lodge is used by Stevens for employee housing to this date.

 
 Respond to this message