I've been asked a few times why no dock work is yet happening at Marina Pointe (mostly by Evansville folks).

The components of the dock are being built and modified in other cities and states. A large barge platform is being modified in Paducah, Kentucky. The ramps (gangways) are being built in Wisconsin. By the way, these ramps are fourteen feet wide and the slope will be gentle; this will allow golf carts to be used to transport wheelchair bound folks to the deck of the ship. The ticket/gift shop barge work is being done in Evansville. Captain Jornlin and Lois were here in Evansville last week inspecting that work and giving us suggestions.

All of this work is underway and has been for several weeks.

When these various components are finished, they can be installed at Marina Pointe within a two week time period.

The target date for completion of the dock is Sept. 15.

Mike Whicker
Evansville

 
 Respond to this message   
Responses

Opinions expressed in this forum are those of their respective authors, who are solely responsible for their own comments.

Postings are timestamped in Zulu time (Greenwich Mean Time).

All contents of this website are Copyright (c) 2001-2008 The USS LST Ship Memorial, Inc. All Rights Reserved.