Work Week Successes

April 25 2016 at 12:52 PM
Sabrina  (Login SabrinaLST325)

Better planning, communication, and preparation has led to a lot of work being completed efficiently during the Spring Work Weeks!

During the Engineering Week volunteers achieved their goals. We have the ORCA unit in place in the Evap room, 3 cylinders had their liners removed and rings replaced, Ballast piping project was completed, Port Side Head is ready for plumbing, Engine Part Storage has been organized and parts crated for protection.

During the Deck Work Week volunteers needle gunned 2 of the forward 40 mm gun tubs. The Tank Deck Starboard Side was cleaned, scraped, and painted in preparation of the new Archives Display. Work continued in the Port Side Head to remove layers of paint and flooring.

Lots of great pictures on our website at http://www.lstmemorial.org/pages/progress.html and even more on our Facebook page at https://www.facebook.com/USS-LST-Ship-Memorial-Inc-388475534512053/


 
 Respond to this message   

Opinions expressed in this forum are those of their respective authors, who are solely responsible for their own comments.

Postings are timestamped in Zulu time (Greenwich Mean Time).

All contents of this website are Copyright (c) 2001-2008 The USS LST Ship Memorial, Inc. All Rights Reserved.