Footings are in

August 14 2005 at 6:32 PM
TomK  (no login)
from IP address 69.34.50.145


Response to Some action at the bridge

Was up at the Alp parking lot on Saturday the 13th and took a few pictures that I'll send to Mr Hyak for posting.
Basicly, it looks like the bridge footings are in and they are awaiting the arrival of the steelwork.

The new span is going to be a lot longer than the original. Higher as well.

Also, they have laid down a layer of new surface in the main parking lot to fill in the potholes. It looks like old ground up asphalt and gravel similar to what gets removed during a road rebuild. Mayby that's what's been happening to the old Hwy 18 surface.

 