| Original Message |
TomK (no login) Posted Feb 8, 2008 4:22 PM
The concept was informative on why they had to wait till after the lift was fully loaded before clearing additional snow from in front of the lift station. More sag due to the heavy loading of every chair being filled. |
|
|