Return to Index  

Update 27/8/10 - Internal work and a new I/P

August 27 2010 at 10:43 PM
No score for this post
  (no login)
from IP address 121.220.23.22


Response to Talking about Apocalypse Now here's two more Hueys!

 

Having spent all that time scratch building the second I/P I was checking my references and found that the Bushranger I intend to do had a small instrument panel not the full length one of the H model. So, I have decided to put the full length one on the re-build Huey and scratch up the smaller I/P from the kit part. You will see in the photos that it has putty all over the front of it. I have re-painted the ammo bin Medium Green as it was too dark and used a brighter red for the tie down straps. It is yet to be weathered. The cabin seats are in and I've done some instruments on the consoles from the different periods and added the pillars in front of the quarter doors. I've also added the comms cable to one of the ceilings. Here's the pics;

[IMG][linked image][/IMG]

[IMG][linked image][/IMG]

[IMG][linked image][/IMG]

[IMG][linked image][/IMG]

[IMG][linked image][/IMG]

Regards

Andrew

 
Scoring disabled. You must be logged in to score posts.Respond to this message   
Responses

 Copyright © 1999-2014 Network54. All rights reserved.   Terms of Use   Privacy Statement