Train track work

by Russ Kepler

I'm looking forward to starting to lay track on my home track. I have 9 panels done, so 90 feet of track, and need another 300+ feet to get the basic loop done. I have one switch made to check out the process and need to make at least 4 more and better 7, so that's going to be interesting. I have started on the process of putting in the driveway along the shop with a new retaining wall done when my brother made the mistake of staying at my place, now I need to level the ground and drop some gravel to start. That should let me move things around to better access the side yard and start placing roadbed as well as start building the unloading facility (assuming that I get to designing it...)

Posted on Jan 3, 2018, 6:58 AM

Respond to this message

Goto Forum Home

Quantcast

eXTReMe Tracker