| Original Message |
binary Posted Feb 15, 2012 2:42 AM
My big problem with the mythbusters "gpu" style paint thrower.
http://www.youtube.com/watch?v=fKK933KK6Gg
you get one pre compiled picture from it.
now what, how long will it take to prep a second frame. whats the lead time needed to get a picture done
my gut (and I always listen to my gut) is telling me the serial solution(servo mounted tracking head) will get more images in more flexable way(read software) the the uber fast(for one frame only) parallel model. |
|